Referenze

PBO-based FRCM for anti-seismic improvement and structural strengthening at the Ospedale Vecchio in Parma

FRCM PBO-based systems for strengthening and anti-seismic improvement

The Ruregold FRCM structural strengthening systems were used during the process of restoration and redevelopment the Ospedale Vecchio (Old Hospital) in Parma, one of the city’s most important monuments. The strengthening systems were selected for a series of structural strengthening interventions and anti-seismic improvements designed to restore the building’s static functionality.   The solutions selected for this project were Ruregold’s FRCM structural strengthening systems. In this specific instance, PBO-Mesh 22/22 was used, together with MX-PBO Masonry, the cementitious fibre-reinforced inorganic matrix, PBO-Joint, the PBO fibre connector systems, and MX-PVA Fibre-Reinforced mortar, providing excellent results. The system was connected to the substrate using PBO-Joint, the PBO fibre connector developed for use with Ruregold FRCM systems.

Structural and anti-seismic strengthening

The structural strengthening work on the vaults located between the Sottocroce and the Grande Croce involved emptying them out completely, cleaning and rough coating to ensure adhesion of the strengthening system, prior to application of the PBO-Mesh 22/22. In addition, a system of brick spurs was created to optimise transfer of the loads exerted by the slab overlying the vault, which were also strengthened by applying an additional layer of PBO-Mesh 22/22. The work was completed by casting a slab in 9 cm Leca lightweight concrete with expanded clay aggregate.

In addition to restoring the static functionality of the complex, the work also improved resistance to seismic phenomena by approximately 60%.

  Once the work is complete, the urban regeneration project associated with the redevelopment of the Ospedale Vecchio will be divided into a series of initiatives: the creation of a multimedia gallery dedicated to urban culture in the Grande Croce, the relocation of the Puppet Museum to the Sotto­Croce, a Learning Centre complete with Civic Library, a Meeting and Conference Facility and an area dedicated to Collective Memory and Reflection.

Per quale motivo ci vuoi contattare?

    Consenso al trattamento dei dati personali:*

    I campi contrassegnati con l’asterisco (*) sono obbligatori

    Iscriviti alla newsletter

    Rimani aggiornato sulle novità, le soluzioni e i prodotti del mondo Laterlite S.p.A.

      Consenso al trattamento dei dati personali:*

      I campi contrassegnati con l’asterisco (*) sono obbligatori

      How can we help you?

      Error: Contact form not found.

      Subscribe to our newsletter

      Stay up to date on news, solutions and products from the world of Laterlite S.p.A.

      Error: Contact form not found.

      How can we help you?

      Error: Contact form not found.

      How can we help you?

      Error: Contact form not found.

      How can we help you?

      Error: Contact form not found.